Description
12mm 12vdc 100ct pixel nodes 18awg BLACK wire with Pigtails
Features:
1. 12mm diameter
2. IP68 rated, epoxy resin filled design
3. Voltage 12vdc
4. 100-120 degree viewing angle
5. Max power 0.30w
6. Full RGB color / 24bit / 256 gray scale